The Resource Plan amendment / final EIS for the Palen Solar Power Project : for the Palm Springs-South Coast Field Office

Plan amendment / final EIS for the Palen Solar Power Project : for the Palm Springs-South Coast Field Office

Label
Plan amendment / final EIS for the Palen Solar Power Project : for the Palm Springs-South Coast Field Office
Title
Plan amendment / final EIS for the Palen Solar Power Project
Title remainder
for the Palm Springs-South Coast Field Office
Title variation
  • Palen Solar Power Project
  • Final environmental impact statement, plan amendment: Palen Solar Power Project
Contributor
Subject
Language
eng
Summary
This Plan Amendment/Final Environmental Impact Statement (PA/FEIS) addresses two decisions by the United States Bureau of Land Management (BLM): the possible approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to recognize the site of the proposed Palen Solar Power Project (PSPP); and the possible approval of a right-of-way (ROW) grant to Palen Solar for construction, operation and decommissioning of a solar electricity generation facility
Additional physical form
Also available via Internet.
Cataloging source
UDD
Government publication
federal national government publication
Illustrations
  • illustrations
  • maps
Index
index present
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://library.link/vocab/relatedWorkOrContributorName
United States
http://library.link/vocab/subjectName
  • Solar power plants
  • Public lands
  • California Desert National Conservation Area (Calif.)
  • Environmental impact statements
  • Palen Solar Power Project
  • Electric power transmission
  • Overhead electric lines
  • Ecology
  • Electric power transmission
  • Overhead electric lines
  • Solar power plants
  • California
Label
Plan amendment / final EIS for the Palen Solar Power Project : for the Palm Springs-South Coast Field Office
Link
Instantiates
Publication
Note
  • "May 2011."
  • "BLM/CA/ES-2011-11+1793"--verso title page
  • "DOI Control No. FES 11-06"
  • "NEPA Tracking # DOI-BLM-CA-060-0010-0015-EIS"--verso title page
Bibliography note
Includes bibliographical references and index
Extent
1 online resource (2 volumes (various pagings)
Form of item
online
Other physical details
color illustrations, color maps)
Specific material designation
remote
Label
Plan amendment / final EIS for the Palen Solar Power Project : for the Palm Springs-South Coast Field Office
Link
Publication
Note
  • "May 2011."
  • "BLM/CA/ES-2011-11+1793"--verso title page
  • "DOI Control No. FES 11-06"
  • "NEPA Tracking # DOI-BLM-CA-060-0010-0015-EIS"--verso title page
Bibliography note
Includes bibliographical references and index
Extent
1 online resource (2 volumes (various pagings)
Form of item
online
Other physical details
color illustrations, color maps)
Specific material designation
remote

Library Locations

  • Internet ArchiveBorrow it
    300 Funston Ave, San Francisco, CA, 94118, US
    37.7823215 -122.4716373

Library Links

Processing Feedback ...