The Resource Final environmental impact statement Imperial Valley Solar Project, for the El Centro Field Office

Final environmental impact statement Imperial Valley Solar Project, for the El Centro Field Office

Label
Final environmental impact statement Imperial Valley Solar Project
Title
Final environmental impact statement Imperial Valley Solar Project
Statement of responsibility
for the El Centro Field Office
Title variation
Imperial Valley Solar Project
Contributor
Subject
Language
eng
Summary
This Final Environmental Impact Statement (FEIS) addresses the possible United States Bureau of Land Management (BLM) approval of an amendment to the California Desert Conservation Area Plan (CDCA Plan) to allow for solar energy and of a right-of-way (ROW) grant to lease land managed by the BLM for construction and operation of a solar electricity generation facility. The Agency Preferred Alternative covers approximately 6,144 acres (ac), managed by the BLM, and would generate 709 megawatts (MW) of electricity annually. The FEIS identifies impacts of the Agency Preferred Alternative, including impacts related to biological resources, cultural resources, land use, visual resources, and hydrology, water quality, and water use. Many of these adverse impacts can be avoided or substantially reduced based on compliance with applicable laws, ordinances, regulations and standards, and compliance with measures provided in this FEIS
Additional physical form
Also available via Internet.
Cataloging source
UDD
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://library.link/vocab/relatedWorkOrContributorName
United States
http://library.link/vocab/subjectName
  • Solar power plants
  • Electric power transmission
  • Imperial Valley (Calif. and Mexico)
  • Public lands
  • Solar power plants
  • Electric power transmissionÂ
  • North America
Label
Final environmental impact statement Imperial Valley Solar Project, for the El Centro Field Office
Link
Instantiates
Publication
Note
  • "July 2010"
  • "BLM/CA/ES-2010-012+1793"--Title page verso
  • "FES 10-29"--Title page verso
Bibliography note
Includes bibliographic references
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Contents
volume 1 : Signature page through Chapter 11, Glossary -- volume 2 : Appendices A through I
Extent
1 online resource (2 volumes (various pages)
Form of item
online
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations (color), maps (color) Â )
Specific material designation
remote
System details
  • Mode of access: World Wide Web
  • System requirements: Adobe Acrobat Reader
Label
Final environmental impact statement Imperial Valley Solar Project, for the El Centro Field Office
Link
Publication
Note
  • "July 2010"
  • "BLM/CA/ES-2010-012+1793"--Title page verso
  • "FES 10-29"--Title page verso
Bibliography note
Includes bibliographic references
Carrier category
volume
Carrier category code
nc
Carrier MARC source
rdacarrier
Content category
text
Content type code
txt
Content type MARC source
rdacontent
Contents
volume 1 : Signature page through Chapter 11, Glossary -- volume 2 : Appendices A through I
Extent
1 online resource (2 volumes (various pages)
Form of item
online
Media category
unmediated
Media MARC source
rdamedia
Media type code
n
Other physical details
illustrations (color), maps (color) Â )
Specific material designation
remote
System details
  • Mode of access: World Wide Web
  • System requirements: Adobe Acrobat Reader

Library Locations

  • Internet ArchiveBorrow it
    300 Funston Ave, San Francisco, CA, 94118, US
    37.7823215 -122.4716373

Library Links

Processing Feedback ...