The Resource Draft environmental impact statement/environmental impact report (EIS/EIR) for the Granite Mountain Wind Energy Project, for the Barstow Field Office

Draft environmental impact statement/environmental impact report (EIS/EIR) for the Granite Mountain Wind Energy Project, for the Barstow Field Office

Label
Draft environmental impact statement/environmental impact report (EIS/EIR) for the Granite Mountain Wind Energy Project
Title
Draft environmental impact statement/environmental impact report (EIS/EIR) for the Granite Mountain Wind Energy Project
Statement of responsibility
for the Barstow Field Office
Title variation
Granite Mountain Wind Energy Project
Contributor
Subject
Language
eng
Summary
Granite Wind LLC, the Applicant, is proposing to develop an up to 84-megawatt wind energy plant and associated facilities on about 100 acres within a larger 2,756-acre area that includes 2,086 acres of public lands administered by the BLM Barstow Field Office and 670 acres of privately-owned land under the County of San Bernardino land-use jurisdiction. The site of the Proposed Action is located on unincorporated land in the Mojave Desert, approximately six miles east of the Town of Apple Valley and five miles northwest of the unincorporated community of Lucerne Valley, on the central ridge of the Granite Mountains. Also included in the proposal are a new access road to the project site, a new transmission line from the project site to an existing 220kV Southern California Edison (SCE) transmission line located in a utility corridor east of the site, and a new approximately 10-acre electrical substation (Jasper Substation) at the site of the SCE interconnection. In addition, the proposal includes an amendment to the CDCA Plan that would designate the proposed site as suitable for wind energy generation and allow for Siting of approximately 1 mile of the new 3.2-to 4.7-mile transmission line from the project site to be located outside of a utility corridor
Cataloging source
UDD
Government publication
federal national government publication
Illustrations
  • illustrations
  • maps
  • charts
  • photographs
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://library.link/vocab/relatedWorkOrContributorName
  • Trost, Roxie C
  • San Bernardino County (Calif.)
http://library.link/vocab/subjectName
  • Wind power
  • Wind turbines
  • Wind power plants
  • Wind power industry
  • Electric power distribution
  • Electric power transmission
  • Renewable energy sources
  • Environmental impact statements
  • Public lands
  • Electric power distribution
  • Electric power transmission
  • Environmental impact statements
  • Renewable energy sources
  • Wind power
  • Wind power industry
  • Wind power plants
  • Wind turbines
Label
Draft environmental impact statement/environmental impact report (EIS/EIR) for the Granite Mountain Wind Energy Project, for the Barstow Field Office
Link
Instantiates
Publication
Note
  • Volume 2 is on CD-ROM located in front pocket of volume 1
  • "DES 10-11"
  • "April 2010"
Accompanying material
1 CD-ROM, 4 3/4 in.)
Extent
1 online resource (2 volumes
Form of item
online
Other physical details
illustrations, maps (color) ;
Specific material designation
remote
Label
Draft environmental impact statement/environmental impact report (EIS/EIR) for the Granite Mountain Wind Energy Project, for the Barstow Field Office
Link
Publication
Note
  • Volume 2 is on CD-ROM located in front pocket of volume 1
  • "DES 10-11"
  • "April 2010"
Accompanying material
1 CD-ROM, 4 3/4 in.)
Extent
1 online resource (2 volumes
Form of item
online
Other physical details
illustrations, maps (color) ;
Specific material designation
remote

Library Locations

  • Internet ArchiveBorrow it
    300 Funston Ave, San Francisco, CA, 94118, US
    37.7823215 -122.4716373

Library Links

Processing Feedback ...